power outage and timecard correction, please see inside - sm Posted: Apr 24th, 2018 - 2:08 pm
Power went out while I was working and couldn't clock out. Power comes back on and I start working again and I finished out my shift and then clocked out.
My hours will not be correct because I was unable to clock out when power went out.
I need to manually change the time when I first would have clocked out when power went out and then I need to manually clock back in when the power came back on. Am I able to do that or is that something my manager will have to fix?
Sorry if I am confusing you as I am very confused myself.
I have a clock in and clock out time, but need to add the clock out when power went out and then clock back in when power came back on.
Post A Reply Reply By Email Options
Complete Discussion Below: ( marks the location of current message within thread)
|