A community of 30,000 US Transcriptionist serving Medical Transcription Industry
I can't figure out the best way to enter my time with SoftScript. I have been told several times to enter only the time spent typing, which is okay but then it looks like I only typed 2/3 of my shift. Just calculating typing time alone is around 200 lph. If I include proofreading, reviewing account specs, and slow upload/download times added in, my line count is too low. HELP! Can't seem to make them happy either way!
Mid winter they had no work....but now that there is work, they expect the minimum requirement.
I ALWAYS work my complete shift and have only asked to switch nights once in the 5 months I have worked for them. My last accuracy check was 100%!!!! You would think those things would come into play here, but they still sent out an email reminding me that my line counts were too low and to only record the time spent typing. UGH.