Hi all! I have been at this now for about 9-1/2 years and now that I have gotten serious about trying to work it like a normal job, it seems EVERYTHING gets in the way!!! arrgh.
I work for two companies, one with assigned doctors (not much work) and one with pool work. I am struggling to consistently work enough hours doing the pool work. The money is good and the lines are decent, but it seems I have a hard time committing to it.
With the assigned doctors, they have XX patients, and I know I do those patients and I am done. I can't seem to finish out my time with the pool work. It is just stupid.
Anyway, after giving it a bit of thought this weekend, I decided to work my schedule like this. I will say because I have done assigned docs for so long, I am geared towards having a schedule of XX patients to work through and I don't have that with the pool work.
6 a.m. to 4 p.m.
6-10 pool work, 10-12 assigned doc, 12-4 pool work.
The issue I am having is my phone is ringing or there are issues with the kids, etc. So already this morning, basically 4 hours today have been shot due to phone/kids (HUGE ordeal this morning - I still have two kids at home, 16 and 17 - the joy of parenthood hehe).
I just feel like I can't get anywhere. Currently I am doing the assigned doc and of course no one is calling, no drama, etc., so I will go right through his work with no problems.
How do those of you who do pool work schedule yourselves? I think if I could ever get myself on a schedule with the pool work, which there is plenty of, I would drop the assigned doctor. My thinking is December 31 
Maybe my brain is just stuck on checking off patients on a list instead of playing "beat the clock" doing the pool work
HELP!!!!! |